| Link to: | Ron Ayers' Picture Gallery | Ron Ayers Homepage |
|
|
Left: Construction of electrical sub-station frame. One of the main projects being worked on at the time of the visit was a series of electrical sub-station frames. Sections were cut to size in the fabrication workshop, prepared in the sandblasting area and partially painted. They were then assembled by field welding in the fabricator's yard. |
| Right: Field welding. |
|
|
|
Left: Field assembly. |
Page last modified 12 October 2005.